Linx Nova logo
Linx NovaPosted 2 weeks ago

Low Voltage Foreman – Hyperscale Data Center Construction

$62,400–$79,040 year

On-siteSalt Lake City, Utah, United States

Full TimeSmall

Job Summary

Lead a team of low voltage technicians on active hyperscale data center and commercial construction jobsites, setting daily goals, managing productivity, and solving problems in real time. Own daily execution of structured cabling, fiber optic, and low voltage infrastructure scopes, including high-density fiber networks and Cat6A/Cat8 pathway systems. Monitor job progress against schedule, track costs using project reporting tools and Bluebeam, and adjust crew deployment and material staging to protect the timeline. Train technicians in installation methods, test equipment operation, safety procedures, and quality standards. Operate and interpret results from test equipment including Fluke Testers, OTDR's & power meters, and ensure all test documentation meets project specifications. Lead daily safety compliance on-site, conducting toolbox talks, hazard identification, and PPE enforcement. Maintain professional communication with clients and GCs, representing LINX as a competent operation. Participate in pre-bid walkthroughs and post-project reviews with Project Managers, Estimating, and Sales.

Required Qualifications

  • 3–5 years of hands-on low voltage or structured cabling installation experience
  • mastery of installation methods, tools, and quality standards across copper and fiber systems
  • 1–2 years in a field leadership role — Lead Technician, working Foreman, or equivalent
  • responsibility for crew productivity and quality
  • Experience with hyperscale data center clients such as AWS, Google, Microsoft, Meta, OCI etc.
  • Full mastery of low voltage tools, equipment, and installation processes
  • Ability to read and interpret construction documents — Scope of Work, Bill of Materials, as-builts, blueprints, and project schedules
  • Proficiency with industry-standard test equipment and the ability to run tests, interpret results, troubleshoot failures, and produce clean documentation
  • Familiarity with project cost tracking and Bluebeam Revu for document management and markup
  • Working knowledge of applicable industry standards - BICSI, Division 27, etc.
  • Demonstrated ability to lead, train, and hold accountable a crew of 10-20 technicians in a fast-paced construction environment
  • Strong written and verbal communication in English
  • Ability to manage staffing, scheduling, timesheets, and change order documentation accurately and on time
  • Valid driver's license

Desired Qualifications

  • BICSI Installer 1 or Installer 2 Certification
  • BICSI Technician
  • Confined Space Certification
  • OSHA 10 or OSHA 30
  • Manufacturer-specific certifications
  • Ability to travel across the USA for projects

Hiring someone like this?

Get your role in front of qualified candidates on Sorce.

Get started

Apply to this job in one click with Sorce

Apply on Sorce