Turner & Townsend logo
Turner & TownsendPosted 1 month ago

Lead Cost Engineer – PMC

On-siteJakarta, Jakarta, Indonesia

Full TimeSenior LevelEnterprise

Job Summary

Lead the PMC cost engineering function for a large brownfield RKEF smelter expansion in Sulawesi, Indonesia, by establishing independent cost assurance between the Owner and EPC Contractor. Manage project budget control, cash flow forecasting, and Estimate at Completion (EAC) development while validating contractor forecasts and identifying emerging cost risks. Execute change management and trend analysis across engineering, procurement, and commissioning, delivering executive dashboards and weekly reporting to support strategic decision-making. Monitor complex supply chain dynamics involving Chinese equipment and navigate operational constraints within an active facility.

Required Qualifications

  • Bachelor's Degree in Engineering, Quantity Surveying, Cost Engineering, Construction Management, Finance, or related discipline
  • Minimum 12–15 years of cost engineering and project controls experience
  • Minimum 5 years as a Lead Cost Engineer or Senior Cost Engineer on major capital projects
  • Experience with EPC project execution
  • Experience developing EACs, cash flows, trends, and forecasts
  • AACE Certified Cost Professional (CCP)
  • AACE Earned Value Professional (EVP)
  • MRICS or FRICS
  • PMP
  • Chartered Engineer (desirable)
  • Mining and Metals projects
  • Nickel, copper, ferroalloy, or steel smelters
  • Brownfield industrial expansions
  • PMC, Owner's Engineer, or EPCM projects
  • Indonesia or Southeast Asia project experience
  • Projects involving Chinese EPC contractors and supply chains
  • Large CAPEX projects (>US$500 million)
  • Cost Engineering
  • Cost forecasting
  • Budget management
  • Cost control
  • Trend analysis
  • Change management
  • Cash flow management
  • Earned Value Management (EVM)
  • Primavera P6
  • EcoSys
  • Prism
  • SAP
  • Power BI
  • Oracle
  • Advanced Excel
  • EPC contracts
  • Claims impacts
  • Variations
  • Procurement commercial structures
  • Risk-based forecasting
  • Analytical thinking
  • Commercial acumen
  • Attention to detail
  • Problem solving
  • Influencing skills
  • Communication and presentation
  • Stakeholder management
  • Independent judgement
  • Process Facilities
  • Rotary Kilns
  • Electric Furnaces
  • Furnace Transformers
  • Electrode Systems
  • Ore Drying Systems
  • Coal Handling Facilities
  • Slag Handling Facilities
  • Infrastructure and Utilities
  • HV Substations
  • Power Distribution Systems
  • Water Treatment Systems
  • Cooling Water Systems
  • Fuel Systems
  • Port Infrastructure
  • Brownfield Execution
  • Utility tie-ins
  • Shutdown activities
  • Temporary facilities
  • SIMOPS impacts
  • Operational constraints
  • Commissioning
  • Mechanical Completion
  • Pre-Commissioning
  • Energization
  • Start-up
  • Performance Testing

Desired Qualifications

  • Master's degree preferred
  • Strong understanding of the cost drivers associated with brownfield RKEF smelter expansion
  • Experience with significant procurement from China
  • Experience with major construction activities within an operating facility
  • Experience with extensive shutdown and tie-in works
  • Experience with complex contractor interfaces
  • Experience managing cost risks associated with large brownfield industrial expansion
  • Experience with logistics and importation
  • Experience with contingency allowances
  • Experience with permitting and regulatory costs
  • Experience with logistics and importation
  • Experience with customs costs
  • Experience with expediting-related expenditures
  • Experience with manufacturing cost escalation
  • Experience with currency exposure
  • Experience with shipping market fluctuations
  • Experience with freight escalation
  • Experience with Chinese equipment manufacturing milestones
  • Experience with overseas shipment schedules
  • Experience with major progress payment events
  • Experience with commissioning expenditures
  • Experience with supply chain disruptions
  • Experience with contractor performance issues
  • Experience with design development
  • Experience with brownfield discoveries
  • Experience with utility tie-ins
  • Experience with shutdown restrictions
  • Experience with regulatory requirements
  • Experience with scope growth
  • Experience with access constraints
  • Experience with commissioning requirements
  • Experience with engineering growth
  • Experience with construction productivity losses
  • Experience with additional quantities
  • Experience with logistics impacts
  • Experience with contractor performance issues
  • Experience with supply chain disruptions
  • Experience with operational constraints
  • Experience with shutdown overruns
  • Experience with utility outages
  • Experience with claims
  • Experience with variations
  • Experience with inflationary pressures
  • Experience with Chinese manufacturing delays
  • Experience with shipping disruptions
  • Experience with import restrictions
  • Experience with construction risks
  • Experience with productivity shortfalls
  • Experience with labor market issues
  • Experience with rework
  • Experience with brownfield risks
  • Experience with operational constraints
  • Experience with shutdown activities
  • Experience with restricted access areas
  • Experience with productivity impacts
  • Experience with outage costs
  • Experience with temporary systems
  • Experience with cost consequences resulting from operational constraints
  • Experience with cost drivers associated with process facilities
  • Experience with cost drivers associated with rotary kilns
  • Experience with cost drivers associated with electric furnaces
  • Experience with cost drivers associated with furnace transformers
  • Experience with cost drivers associated with electrode systems
  • Experience with cost drivers associated with ore drying systems
  • Experience with cost drivers associated with coal handling facilities
  • Experience with cost drivers associated with slag handling facilities
  • Experience with cost drivers associated with infrastructure and utilities
  • Experience with cost drivers associated with HV substations
  • Experience with cost drivers associated with power distribution systems
  • Experience with cost drivers associated with water treatment systems
  • Experience with cost drivers associated with cooling water systems
  • Experience with cost drivers associated with fuel systems
  • Experience with cost drivers associated with port infrastructure
  • Experience with cost drivers associated with brownfield execution
  • Experience with cost drivers associated with utility tie-ins
  • Experience with cost drivers associated with shutdown activities
  • Experience with cost drivers associated with temporary facilities
  • Experience with cost drivers associated with SIMOPS impacts
  • Experience with cost drivers associated with operational constraints
  • Experience with cost drivers associated with commissioning
  • Experience with cost drivers associated with mechanical completion
  • Experience with cost drivers associated with pre-commissioning
  • Experience with cost drivers associated with energization
  • Experience with cost drivers associated with start-up
  • Experience with cost drivers associated with performance testing
  • Experience with cost drivers associated with brownfield RKEF smelter expansion
  • Experience with cost drivers associated with significant procurement from China
  • Experience with cost drivers associated with major construction activities within an operating facility
  • Experience with cost drivers associated with extensive shutdown and tie-in works
  • Experience with cost drivers associated with complex contractor interfaces
  • Experience with cost drivers associated with managing cost risks associated with large brownfield industrial expansion
  • Experience with cost drivers associated with logistics and importation
  • Experience with cost drivers associated with contingency allowances
  • Experience with cost drivers associated with permitting and regulatory costs
  • Experience with cost drivers associated with logistics and importation
  • Experience with cost drivers associated with customs costs
  • Experience with cost drivers associated with expediting-related expenditures
  • Experience with cost drivers associated with manufacturing cost escalation
  • Experience with cost drivers associated with currency exposure
  • Experience with cost drivers associated with shipping market fluctuations
  • Experience with cost drivers associated with freight escalation
  • Experience with cost drivers associated with Chinese equipment manufacturing milestones
  • Experience with cost drivers associated with overseas shipment schedules
  • Experience with cost drivers associated with major progress payment events
  • Experience with cost drivers associated with commissioning expenditures
  • Experience with cost drivers associated with supply chain disruptions
  • Experience with cost drivers associated with contractor performance issues
  • Experience with cost drivers associated with supply chain disruptions
  • Experience with cost drivers associated with design development
  • Experience with cost drivers associated with brownfield discoveries
  • Experience with cost drivers associated with utility tie-ins
  • Experience with cost drivers associated with shutdown restrictions
  • Experience with cost drivers associated with regulatory requirements
  • Experience with cost drivers associated with scope growth
  • Experience with cost drivers associated with access constraints
  • Experience with cost drivers associated with commissioning requirements
  • Experience with cost drivers associated with engineering growth
  • Experience with cost drivers associated with construction productivity losses
  • Experience with cost drivers associated with additional quantities
  • Experience with cost drivers associated with logistics impacts
  • Experience with cost drivers associated with contractor performance issues
  • Experience with cost drivers associated with supply chain disruptions
  • Experience with cost drivers associated with operational constraints
  • Experience with cost drivers associated with shutdown overruns
  • Experience with cost drivers associated with utility outages
  • Experience with cost drivers associated with claims
  • Experience with cost drivers associated with variations
  • Experience with cost drivers associated with inflationary pressures
  • Experience with cost drivers associated with Chinese manufacturing delays
  • Experience with cost drivers associated with shipping disruptions
  • Experience with cost drivers associated with import restrictions
  • Experience with cost drivers associated with construction risks
  • Experience with cost drivers associated with productivity shortfalls
  • Experience with cost drivers associated with labor market issues
  • Experience with cost drivers associated with rework
  • Experience with cost drivers associated with brownfield risks
  • Experience with cost drivers associated with operational constraints
  • Experience with cost drivers associated with shutdown activities
  • Experience with cost drivers associated with restricted access areas
  • Experience with cost drivers associated with productivity impacts
  • Experience with cost drivers associated with outage costs
  • Experience with cost drivers associated with temporary systems
  • Experience with cost drivers associated with cost consequences resulting from operational constraints
  • Experience with cost drivers associated with cost drivers associated with process facilities
  • Experience with cost drivers associated with cost drivers associated with rotary kilns
  • Experience with cost drivers associated with cost drivers associated with electric furnaces
  • Experience with cost drivers associated with cost drivers associated with furnace transformers
  • Experience with cost drivers associated with cost drivers associated with electrode systems
  • Experience with cost drivers associated with cost drivers associated with ore drying systems
  • Experience with cost drivers associated with cost drivers associated with coal handling facilities
  • Experience with cost drivers associated with cost drivers associated with slag handling facilities
  • Experience with cost drivers associated with cost drivers associated with infrastructure and utilities
  • Experience with cost drivers associated with cost drivers associated with HV substations
  • Experience with cost drivers associated with cost drivers associated with power distribution systems
  • Experience with cost drivers associated with cost drivers associated with water treatment systems
  • Experience with cost drivers associated with cost drivers associated with cooling water systems
  • Experience with cost drivers associated with cost drivers associated with fuel systems
  • Experience with cost drivers associated with cost drivers associated with port infrastructure
  • Experience with cost drivers associated with cost drivers associated with brownfield execution
  • Experience with cost drivers associated with cost drivers associated with utility tie-ins
  • Experience with cost drivers associated with cost drivers associated with shutdown activities
  • Experience with cost drivers associated with cost drivers associated with temporary facilities
  • Experience with cost drivers associated with cost drivers associated with SIMOPS impacts
  • Experience with cost drivers associated with cost drivers associated with operational constraints
  • Experience with cost drivers associated with cost drivers associated with commissioning
  • Experience with cost drivers associated with cost drivers associated with mechanical completion
  • Experience with cost drivers associated with cost drivers associated with pre-commissioning
  • Experience with cost drivers associated with cost drivers associated with energization
  • Experience with cost drivers associated with cost drivers associated with start-up
  • Experience with cost drivers associated with cost drivers associated with performance testing
  • Experience with cost drivers associated with cost drivers associated with brownfield RKEF smelter expansion
  • Experience with cost drivers associated with cost drivers associated with significant procurement from China
  • Experience with cost drivers associated with cost drivers associated with major construction activities within an operating facility
  • Experience with cost drivers associated with cost drivers associated with extensive shutdown and tie-in works
  • Experience with cost drivers associated with cost drivers associated with complex contractor interfaces
  • Experience with cost drivers associated with cost drivers associated with managing cost risks associated with large brownfield industrial expansion
  • Experience with cost drivers associated with cost drivers associated with logistics and importation
  • Experience with cost drivers associated with cost drivers associated with contingency allowances
  • Experience with cost drivers associated with cost drivers associated with permitting and regulatory costs
  • Experience with cost drivers associated with cost drivers associated with logistics and importation
  • Experience with cost drivers associated with cost drivers associated with customs costs
  • Experience with cost drivers associated with cost drivers associated with expediting-related expenditures
  • Experience with cost drivers associated with cost drivers associated with manufacturing cost escalation
  • Experience with cost drivers associated with cost drivers associated with currency exposure
  • Experience with cost drivers associated with cost drivers associated with shipping market fluctuations
  • Experience with cost drivers associated with cost drivers associated with freight escalation
  • Experience with cost drivers associated with cost drivers associated with Chinese equipment manufacturing milestones
  • Experience with cost drivers associated with cost drivers associated with overseas shipment schedules
  • Experience with cost drivers associated with cost drivers associated with major progress payment events
  • Experience with cost drivers associated with cost drivers associated with commissioning expenditures
  • Experience with cost drivers associated with cost drivers associated with supply chain disruptions
  • Experience with cost drivers associated with cost drivers associated with contractor performance issues
  • Experience with cost drivers associated with cost drivers associated with supply chain disruptions
  • Experience with cost drivers associated with cost drivers associated with design development
  • Experience with cost drivers associated with cost drivers associated with brownfield discoveries
  • Experience with cost drivers associated with cost drivers associated with utility tie-ins
  • Experience with cost drivers associated with cost drivers associated with shutdown restrictions
  • Experience with cost drivers associated with cost drivers associated with regulatory requirements
  • Experience with cost drivers associated with cost drivers associated with scope growth
  • Experience with cost drivers associated with cost drivers associated with access constraints
  • Experience with cost drivers associated with cost drivers associated with commissioning requirements
  • Experience with cost drivers associated with cost drivers associated with engineering growth
  • Experience with cost drivers associated with cost drivers associated with construction productivity losses
  • Experience with cost drivers associated with cost drivers associated with additional quantities
  • Experience with cost drivers associated with cost drivers associated with logistics impacts
  • Experience with cost drivers associated with cost drivers associated with contractor performance issues
  • Experience with cost drivers associated with cost drivers associated with supply chain disruptions
  • Experience with cost drivers associated with cost drivers associated with operational constraints
  • Experience with cost drivers associated with cost drivers associated with shutdown overruns
  • Experience with cost drivers associated with cost drivers associated with utility outages
  • Experience with cost drivers associated with cost drivers associated with claims
  • Experience with cost drivers associated with cost drivers associated with variations
  • Experience with cost drivers associated with cost drivers associated with inflationary pressures
  • Experience with cost drivers associated with cost drivers associated with Chinese manufacturing delays
  • Experience with cost drivers associated with cost drivers associated with shipping disruptions
  • Experience with cost drivers associated with cost drivers associated with import restrictions
  • Experience with cost drivers associated with cost drivers associated with construction risks
  • Experience with cost drivers associated with cost drivers associated with productivity shortfalls
  • Experience with cost drivers associated with cost drivers associated with labor market issues
  • Experience with cost drivers associated with cost drivers associated with rework
  • Experience with cost drivers associated with cost drivers associated with brownfield risks
  • Experience with cost drivers associated with cost drivers associated with operational constraints
  • Experience with cost drivers associated with cost drivers associated with shutdown activities
  • Experience with cost drivers associated with cost drivers associated with restricted access areas
  • Experience with cost drivers associated with cost drivers associated with productivity impacts
  • Experience with cost drivers associated with cost drivers associated with outage costs
  • Experience with cost drivers associated with cost drivers associated with temporary systems
  • Experience with cost drivers associated with cost drivers associated with cost consequences resulting from operational constraints
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with process facilities
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with rotary kilns
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with electric furnaces
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with furnace transformers
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with electrode systems
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with ore drying systems
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with coal handling facilities
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with slag handling facilities
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with infrastructure and utilities
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with HV substations
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with power distribution systems
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with water treatment systems
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with cooling water systems
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with fuel systems
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with port infrastructure
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with brownfield execution
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with utility tie-ins
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with shutdown activities
  • Experience with cost drivers associated with cost drivers associated with cost drivers associated with temporary facilities

Hiring someone like this?

Get your role in front of qualified candidates on Sorce.

Get started

Apply to this job in one click with Sorce

Apply on Sorce