Flat Roller 2nd Shift
$40,560–$52,728 year
On-siteChehalis, Washington, United States
Chehalis, Washington, United StatesOn-siteFull Time$40,560–$52,728 yearLarge
Full TimeLarge
Job Summary
Install screen mesh into door or window screen frames and properly sequence orders while visually inspecting for defects or errors in materials. Verify size, color, customer, configuration, and hardware according to labeling systems before sequencing items into racks for the next step. Follow all safety procedures, rules, and guidelines, notifying supervisors of any existing or potential safety issues. Perform related work as required while maintaining attendance and adhering to the 2:30 PM to 11:00 PM shift schedule.
Required Qualifications
- Ability to lift 25 pounds
- Responsible for attending work on time and for scheduled hours each day
- Follows all safety procedures, rules, and guidelines; and notifies the supervisor of any existing or potential safety issues
- Visually inspect for defects or errors in materials
- Verify size, color, customer, configuration (hardware), according to labeling system
- Sequence into rack for next step
- Perform related work as required
- Ability to follow both written and verbal directions
Desired Qualifications
- At least 6 months of production, assembly or related work experience preferred
Hiring someone like this?
Get your role in front of qualified candidates on Sorce.